-

This site is deprecated and will be decommissioned shortly. For current information regarding HPC visit our new site: hpc.njit.edu

Difference between revisions of "ForPToC"

From NJIT-ARCS HPC Wiki
Jump to: navigation, search
(Importing text file)
(Importing text file)
Line 11: Line 11:
 
<ul>
 
<ul>
 
   <li>Salient points from https://www.nsf.gov/pubs/2021/nsf21528/nsf21528.htm,
 
   <li>Salient points from https://www.nsf.gov/pubs/2021/nsf21528/nsf21528.htm,
thet must be considered in genereating the proposal</li>
+
that must be considered in generating the proposal</li>
 
</ul>
 
</ul>
  
Line 17: Line 17:
 
<ul>
 
<ul>
 
   <li>NSF expectations from https://www.nsf.gov/pubs/2021/nsf21528/nsf21528.htm,
 
   <li>NSF expectations from https://www.nsf.gov/pubs/2021/nsf21528/nsf21528.htm,
thet must be considered in genereating the proposal</li>
+
that must be considered in generating the proposal</li>
 
</ul>
 
</ul>
 
 
 
   <li>NSF CC* Program Area 4: Public-Access GPUs Proposal: Project Timeline</li>
 
   <li>NSF CC* Program Area 4: Public-Access GPUs Proposal: Project Timeline</li>
 
   <ul>
 
   <ul>
<li>Timeline, with sections and those responsible for those sections</li>
+
<li>Timeline, with sections, listing those responsible for that section</li>
 
</ul>
 
</ul>
  
Line 33: Line 33:
 
   <li>Section_N</li>
 
   <li>Section_N</li>
 
   <ul>
 
   <ul>
<li>Section_1-6, containing content specified in the <li>Project Timeline</li>
+
<li>Section_1-6, containing content specified in the <em>Project Timeline</em></li>
 
</ul>
 
</ul>
 
    
 
    

Revision as of 18:02, 2 February 2021

Contents of folder NSF 21-528 CC* Program Area 4 Feb 2021

  1. CC* Compute: A GPU Expansion of the NJIT High Performance Computing Infrastructure
    • Proposal structure
    • </ul

    • CCStarSalientPoints
    • CCStarExpectations
    • NSF CC* Program Area 4: Public-Access GPUs Proposal: Project Timeline
      • Timeline, with sections, listing those responsible for that section
    • Project Timeline Content Instructions
      • Instructions for providing the content listed in the Project Timeline


    • Section_N
      • Section_1-6, containing content specified in the Project Timeline
    • nsf_cc_2016,rutgers.pdf
      • Rutgers Univ. successful CC* 2016 networking infrastucture proposal
      </ol>