-

This site is deprecated and will be decommissioned shortly. For current information regarding HPC visit our new site: hpc.njit.edu

Difference between revisions of "ForPHPCMajorExpansion"

From NJIT-ARCS HPC Wiki
Jump to: navigation, search
(Importing text file)
(Importing text file)
Line 1: Line 1:
 
<div class="noautonum">__TOC__</div>
 
<div class="noautonum">__TOC__</div>
  
==ForPHPCMajorExpansion 01Sep21-16:28==
+
==ForPHPCMajorExpansion R08Sep21-15:15=
  
 
== 1. Preamble ==
 
== 1. Preamble ==
  
There will be a major, multi-million dollar upgrade to NJIT's high performance computing (HPC)
+
There will be a major, multi-million dollar upgrade to NJIT's high performance  
infrastructure, scheculed to be on-line in February 2022.
+
computing (HPC) infrastructure, scheculed to be on-line in February 2022.
  
 
This upgrade will include:
 
This upgrade will include:
Line 19: Line 19:
 
</ul>
 
</ul>
  
The purpose of this form is to obtain information from researchers that will be used to determine the
+
The purpose of this form is to obtain information from researchers that will be used to  
hardware specifications of this expansion.
+
determine the hardware specifications of this expansion.
  
 
By providing input, you will influence the final specifications for this expansion.
 
By providing input, you will influence the final specifications for this expansion.
  
 
=== Defs ===
 
=== Defs ===
 
+
IST-managed high performance computing (HPC) clusters are :
In this assessment, <em>IST-managed high performance computing (HPC) resources</em> refers to :
+
 
<ul>
 
<ul>
<li>Lochness cluster</li>
+
<li>Lochness</li>
<li>Kong cluster</li>
+
<ul>
<li>Stheno cluster</li>
+
<li>Public-access and privately-owned nodes, both CPU and
<li>Non-cluster machines: Antigua, Baozi, Cnrdp, Gorgon, Icl1, Inti, Jimmy, Louise, Phi, Silo100,
+
GPU</li>
Solardb, Thelma</li>
+
</ul>
 +
 
 +
<li>Stheno</li>
 +
<ul>
 +
<li>CPU and GPU nodws, ownwd by the Dept. of Mathematical
 +
Sciences></li>
 +
</ul>
 
</ul>
 
</ul>
  
Line 128: Line 133:
 
2.4 Please provide a <strong>brief, specific</strong> description(s) of the computational work for which you and/or your research group use IST-managed HPC {text box} (goes in 2.3)
 
2.4 Please provide a <strong>brief, specific</strong> description(s) of the computational work for which you and/or your research group use IST-managed HPC {text box} (goes in 2.3)
  
2.5 For which of the areas you selected in 2.4 are you currently using GPUs, and what </strong>software</strong> do you use in those areas
+
== 3. Main ==
 +
3.1 List the applications that you run on the Lochness and/or Stheno clusters
  
2.5a If <strong>public-access</strong> GPUs were available, would you use them
+
3.2 How often do you submit jobs to be run on the Lochness and/or Stheno clusters
 
<ul>
 
<ul>
</li>Yes</li>
+
<li>Several times a day</li>
<li>No</li>
+
<li>Daily</li>
<li>Don't know</li>
+
<li>Every few days</li>
</ul
+
<li>Weekly</li>
 
+
<li>Monthly</li>
2.6 If <strong>public-access</strong> GPUs were available, to what extent would that <strong>enhance</strong> your :
+
<ul>
+
<li>Research</li>
+
<ul>
+
<li>Large</li>
+
<ul>
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>Moderate</li>
+
<ul>
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>Small</li>
+
<ul>
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>No effect/NA</li>
+
</ul>
+
 
+
<li>Teaching</li>
+
<ul>
+
<li>Large</li>
+
<ul>
+
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>Moderate</li>
+
<ul>
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>Small</li>
+
<ul>
+
<li>Permit larger versions of current models</li>
+
<li>Permit model types not currently feasible</li>
+
<li>Other {text box}</li>
+
</ul>
+
<li>No effect/NA</li>
+
 
+
</ul>
+
 
</ul>
 
</ul>
 
2.7 If <strong>public-access</strong> GPUs were available, what is your estimate of your use of them for :
 
<ul>
 
<li>Research</li>
 
<ul>
 
<li>Heavy</li>
 
<ul>
 
<li>As discussed ...</li>
 
</ul>
 
<li>Moderate</li>
 
<li>Light</li>
 
<li>None</li>
 
<li>Don't know</li>
 
</ul>
 
<li>Teaching</li>
 
<ul>
 
<li>Heavy</li>
 
<li>Moderate</li>
 
<li>Light</li>
 
<li>None</li>
 
<li>Don't know</li>
 
</ul>
 
</ul>
 
 
== 3. Detailed research/teaching GPU info ==
 
 
3.1 The success of this NSF grant proposal depends on providing solid justification for public-access GPUs in research
 
and/or teaching.
 
 
Please describe the role of GPUs in your research and/or teaching, and
 
how public-access GPUs would materially support that research and/or teaching {text box}
 
 
== 4. End game ==
 
4.1 Please provide any further comments {text box, optional}
 
 
<!--
 
The final questions are about the device and browser that you used.
 
 
3.2 What device did you use for this form? {dd menu}
 
<ul>
 
<li>Desktop computer</li>
 
<li>Laptop</li>
 
<li>Tablet</li>
 
<li>Smartphone</li>
 
</ul>
 
 
3.3 What browser did you use? {dd menu}
 
<ul>
 
<li>Chrome</li>
 
<li>Firefox</li>
 
<li>Internet Explorer / Edge</li>
 
<li>Safari</li>
 
<li>Other</li>
 
</ul>
 
 
3.4 Did you encounter any problems with visual presentation and/or navigating the form? {button yes/no}
 
 
If yes
 
 
Please describe the visual presentation and/or navigation problem(s) you encountered in taking the assessment {text box}
 
-->
 

Revision as of 21:34, 8 September 2021

=ForPHPCMajorExpansion R08Sep21-15:15

1. Preamble

There will be a major, multi-million dollar upgrade to NJIT's high performance computing (HPC) infrastructure, scheculed to be on-line in February 2022.

This upgrade will include:

  • A significant increase in the number of public-access CPU nodes
  • A significant increase in the number of public-access GPU nodes
  • High-speed inteconnects (InfiniBand) to all new nodes
  • A parallel file system PFS with a capacity of at least a petabyte
  • Cluster management software
  • Support for the SLURM scheduler/resotce manager

The purpose of this form is to obtain information from researchers that will be used to determine the hardware specifications of this expansion.

By providing input, you will influence the final specifications for this expansion.

Defs

IST-managed high performance computing (HPC) clusters are :

  • Lochness
    • Public-access and privately-owned nodes, both CPU and GPU
  • Stheno
    • CPU and GPU nodws, ownwd by the Dept. of Mathematical Sciences>

2. Get the data

2.1 What is your NJIT position? {button}

  • Faculty
    • Tenured
    • Tenure-track
    • Non-tenure-track
  • Academic research staff {text box}
  • Postdoc

2.1.1 What is your department {dd menu}

Newark College of Engineering

  • Biomedical Engineering
  • Biological and Pharmaceutical Engineering
  • Civil and Environmental Engineering
  • Electrical and Computer Engineering
  • Engineering Technology
  • Mechanical and Industrial Engineering
  • Other {text box}

College of Science and Liberal Arts

  • Aerospace Studies (AFROTC)
  • Chemistry and Environmental Science
  • Humanities
  • Mathematical Sciences
  • Physics
  • Federated Department of Biological Sciences
  • Federated Department of History
  • Rutgers/NJIT Theatre Arts Program
  • Other {text box}

Ying Wu College of Computing

  • Computer Science
  • Informatics
  • Other {text box}

Martin Tuchman School of Management

College of Architecture and Design

  • NJ School of Architecture
  • School of Art and Design
  • Other {text box}<

2.2 For approximately how long have you and/or your research group been using IST-managed high performance computing (HPC) resources? {dd menu}

  • Less than 6 months
  • 6+ to 12 months
  • 1+ to 2 years
  • 2+ to 5 years
  • 5+ years
  • Don't know

2.3 What is the general classification of computations for which you and/or your research group use IST-managed HPC {check all that apply}

  • Bioinfomatics
  • Bioinformatics
  • Biophysics
  • Computational PDE
  • Computational biophysics
  • Computational chemistry
  • Computational fluid dynamics
  • Computational physics and chemistry
  • Condensed matter physics
  • Electromagnetism, Wave propagation
  • Granular science
  • Image forensics
  • Materials research
  • Monte Carlo
  • Neural networks, genetic algorithms
  • Software verification, static analysis
  • Statistical analysis
  • Steganalysis and image forensics
  • Transportation data analysis
  • Other {text box}

2.4 Please provide a brief, specific description(s) of the computational work for which you and/or your research group use IST-managed HPC {text box} (goes in 2.3)

3. Main

3.1 List the applications that you run on the Lochness and/or Stheno clusters

3.2 How often do you submit jobs to be run on the Lochness and/or Stheno clusters

  • Several times a day
  • Daily
  • Every few days
  • Weekly
  • Monthly