-
This site is deprecated and will be decommissioned shortly. For current information regarding HPC visit our new site: hpc.njit.edu
Difference between revisions of "ARCSHPCStaffAvailability"
From NJIT-ARCS HPC Wiki
(Importing text file) |
(Importing text file) |
||
Line 2: | Line 2: | ||
== ARCS HPC Staff Availability 25 January 2021 through 01 March 2021 == | == ARCS HPC Staff Availability 25 January 2021 through 01 March 2021 == | ||
− | Due to a) a time-critical grant proposal preparation | + | Due to: a) a time-critical grant proposal preparation; and b) the |
replacement of the Kong public-access nodes with new public-access nodes | replacement of the Kong public-access nodes with new public-access nodes | ||
− | in the Lochness cluster, the following guidelines will be in effect | + | in the Lochness cluster, the following guidelines will be in effect |
− | + | from 25 January to 02 March: | |
<ol> | <ol> | ||
<li>The only software requests - HPC-specific and otherwise - | <li>The only software requests - HPC-specific and otherwise - | ||
that may be considered are those that require a very small | that may be considered are those that require a very small | ||
− | amount of time | + | amount of time (typically less than one hour) for ARCS HPC staff |
+ | to complete</li> | ||
<li>Requests for HPC hardware price quotes will be deferred until | <li>Requests for HPC hardware price quotes will be deferred until | ||
Line 23: | Line 24: | ||
<li>All other tasks of a non-critical or non-emergency | <li>All other tasks of a non-critical or non-emergency | ||
− | nature involving HPC staff will be deferred until after | + | nature involving ARCS HPC staff will be deferred until after |
01 March 2021</li> | 01 March 2021</li> | ||
</ol> | </ol> | ||
Please address any questions on the above to <em>arcs@njit.edu</em> | Please address any questions on the above to <em>arcs@njit.edu</em> |
Latest revision as of 16:17, 24 January 2021
ARCS HPC Staff Availability 25 January 2021 through 01 March 2021
Due to: a) a time-critical grant proposal preparation; and b) the replacement of the Kong public-access nodes with new public-access nodes in the Lochness cluster, the following guidelines will be in effect from 25 January to 02 March:
- The only software requests - HPC-specific and otherwise - that may be considered are those that require a very small amount of time (typically less than one hour) for ARCS HPC staff to complete
- Requests for HPC hardware price quotes will be deferred until after 01 March, with the exception of requests of an emergency nature
- HPC hardware failures will be addressed only if they are of an emergency nature
- The migration of users from the Kong cluster to the Lochness cluster is expected to be completed by 12 April 2021 instead of the originally-planned 15 March 2021
- All other tasks of a non-critical or non-emergency nature involving ARCS HPC staff will be deferred until after 01 March 2021
Please address any questions on the above to arcs@njit.edu