ARCSHPCStaffAvailability

From NJIT-ARCS HPC Wiki
Revision as of 16:17, 24 January 2021 by Hpcwiki1 dept.admin (Talk | contribs) (Importing text file)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

ARCS HPC Staff Availability 25 January 2021 through 01 March 2021

Due to: a) a time-critical grant proposal preparation; and b) the replacement of the Kong public-access nodes with new public-access nodes in the Lochness cluster, the following guidelines will be in effect from 25 January to 02 March:

  1. The only software requests - HPC-specific and otherwise - that may be considered are those that require a very small amount of time (typically less than one hour) for ARCS HPC staff to complete
  2. Requests for HPC hardware price quotes will be deferred until after 01 March, with the exception of requests of an emergency nature
  3. HPC hardware failures will be addressed only if they are of an emergency nature
  4. The migration of users from the Kong cluster to the Lochness cluster is expected to be completed by 12 April 2021 instead of the originally-planned 15 March 2021
  5. All other tasks of a non-critical or non-emergency nature involving ARCS HPC staff will be deferred until after 01 March 2021

Please address any questions on the above to arcs@njit.edu