-

This site is deprecated and will be decommissioned shortly. For current information regarding HPC visit our new site: hpc.njit.edu

Difference between revisions of "ARCSHPCStaffAvailability"

From NJIT-ARCS HPC Wiki
Jump to: navigation, search
(Importing text file)
(Importing text file)
 
Line 2: Line 2:
 
== ARCS HPC Staff Availability 25 January 2021 through 01 March 2021 ==
 
== ARCS HPC Staff Availability 25 January 2021 through 01 March 2021 ==
  
Due to a) a time-critical grant proposal preparation, and b) the  
+
Due to: a) a time-critical grant proposal preparation; and b) the  
 
replacement of the Kong public-access nodes with new public-access nodes
 
replacement of the Kong public-access nodes with new public-access nodes
in the Lochness cluster, the following guidelines will be in effect during
+
in the Lochness cluster, the following guidelines will be in effect  
that period:  
+
from 25 January to 02 March:
 
<ol>
 
<ol>
 
<li>The only software requests - HPC-specific and otherwise -
 
<li>The only software requests - HPC-specific and otherwise -
 
that may be considered are those that require a very small  
 
that may be considered are those that require a very small  
amount of time - typically less than one hour - to complete</li>
+
amount of time (typically less than one hour) for ARCS HPC staff
 +
to complete</li>
  
 
<li>Requests for HPC hardware price quotes will be deferred until
 
<li>Requests for HPC hardware price quotes will be deferred until
Line 23: Line 24:
  
 
<li>All other tasks of a non-critical or non-emergency
 
<li>All other tasks of a non-critical or non-emergency
nature involving HPC staff will be deferred until after
+
nature involving ARCS HPC staff will be deferred until after
 
01 March 2021</li>
 
01 March 2021</li>
 
</ol>
 
</ol>
  
 
Please address any questions on the above to <em>arcs@njit.edu</em>
 
Please address any questions on the above to <em>arcs@njit.edu</em>

Latest revision as of 16:17, 24 January 2021

ARCS HPC Staff Availability 25 January 2021 through 01 March 2021

Due to: a) a time-critical grant proposal preparation; and b) the replacement of the Kong public-access nodes with new public-access nodes in the Lochness cluster, the following guidelines will be in effect from 25 January to 02 March:

  1. The only software requests - HPC-specific and otherwise - that may be considered are those that require a very small amount of time (typically less than one hour) for ARCS HPC staff to complete
  2. Requests for HPC hardware price quotes will be deferred until after 01 March, with the exception of requests of an emergency nature
  3. HPC hardware failures will be addressed only if they are of an emergency nature
  4. The migration of users from the Kong cluster to the Lochness cluster is expected to be completed by 12 April 2021 instead of the originally-planned 15 March 2021
  5. All other tasks of a non-critical or non-emergency nature involving ARCS HPC staff will be deferred until after 01 March 2021

Please address any questions on the above to arcs@njit.edu